Murphy's Law8:設備裝好了,才發現工作台上還有零件

A failure will not appear until a unit has passed final inspection.

The most expensive component is the one that breaks.

In any calculation, any error that can creep in will do so.

Major changes in construction will always be requested after fabrication is nearly completed.

After an instrument has been assembled, extra components will be found on the bench.

在〈Murphy's Law8:設備裝好了,才發現工作台上還有零件〉中有 0 則留言

  1. After an instrument has been assembled, extra components will be found on the bench
    猫猫的表情配得超好
    (*^__^*)
    人生每天都很多无奈消耗。